Why a Planned Move Matters
Minimize Downtime
Detailed planning keeps outage windows as short as possible.
Protect Your Hardware
Proper packing and handling prevent damage in transit.
Full Accountability
Every asset is tracked from the rack to its new location.
One Point of Contact
A single team coordinates the move from start to finish.
Move Planning
Asset inventory, sequencing, and cutover schedules.
What We Move
De-Install
Labeling, disconnecting, and removing equipment from racks.
Packing & Crating
Anti-static and shock-protective packing for sensitive hardware.
Transport Coordination
Secure transport between facilities.
Re-Install
Racking, cabling, and power-up at the new location.
Receiving & Staging
Accepting, checking, and staging new equipment.
Rack Moves
Moving loaded or empty racks within or between facilities.
Every step of the move, from planning to power-up
Our Process
01
Inventory
We record every asset, its location, and its connections.
02
Plan
We build a move sequence and schedule around your cutover windows.
03
De-Install & Pack
Equipment is labeled, disconnected, and packed for transport.
04
Move & Re-Install
Equipment is moved, racked, and recabled to plan.
05
Verify
We confirm every asset is in place and hand off to your team for testing.
How We Protect Your Equipment
Tracked, protected handling from rack to rack
Chain of Custody
Assets tracked by serial number through every step.
Labeling Before Removal
Every cable and device labeled before disconnection.
Site Compliance
We follow access and security rules at both facilities.
Photo Documentation
Before and after photos of racks and connections.
Service Options
Moves of any size, within a facility or across sites
Full Facility Relocation
Moving entire data centers or suites.
Partial Moves
Moving selected racks or systems.
Intra-Facility Moves
Moving equipment between halls or cages.
Receiving & Deployment
Handling inbound equipment for new builds.